| Great Room and Kitchen. Oct. 1, 2009 |
|---|
![]() |
| Great Room with TV and Fireplace. Oct. 1, 2009 |
|---|
![]() |
| House Viewed From Street. Jan. 5, 2010 |
|---|
![]() |
| House from a Helicopter Viewed Overhead. May 11, 2009 |
|---|
![]() |
|
Framing with a View, June, 2008 |
|---|
![]() |
|
Neighbor's Horses |
|---|
![]() |
|
Late October Sunrise over Paia |
|---|
![]() |
|
Moonrise |
|---|
![]() |
|
Panorama View of Property with Footprint of House Full Resolution Image |
|---|
![]() |
|
Topographic Map with House Each Line is Five Feet Water meter and electricity currently on lot, catchment water tanks and wind turbine for agricultural use. |
|---|
![]() Full Resolution Image |
![]() Full Resolution Image |
![]() Full Resolution Image |
| Topographic Model. Each Layer is Five Feet. Click photograph for larger image. | ||
|---|---|---|
![]() Full Resolution Image |
![]() Full Resolution Image |
![]() Full Resolution Image |
| Microsoft Virtual Earth Images of Maluhia Country Ranches. Lot Outlined in Yellow. | ||
![]() Full Resolution Image |
![]() Full Resolution Image |
Google Earth Image of Lot 36. Lot Outlined in Red. | Maluhia Lots Overlaid in Yellow |
![]() |
|
Aerial Topographic Overlay |
|---|
![]() Early Aerial View of Property |
![]() Early Aerial View Oct. 2006 |
![]() Late October Sunrise over Paia |
![]() Blowhole Four Miles to NW |
![]() Freshly Made Rainbow |
![]() Upcountry and Harbor at Night |
![]() Nearby Kahakuloa Head |
![]() Kahakuloa Head |
![]() South Entrance |
![]() Lot Cleared for House |
![]() Grass Grows Back Quickly |
![]() One of Several Fields of Ferns |
![]() Wild Philippine Ground Orchid |
![]() Wild Philippine Ground Orchid |
![]() Path Down to Second Clearing |
![]() Second Clearing for Future Ohana |
![]() Path Cut Near Orchid |
![]() Orchid |
![]() Acacia Koa Tree |
![]() Old Fence Below Second Clearing |
![]() Path Cut by Old Fence |
![]() Second Trail to Stream |
![]() Old Sign Found in Middle of Property (you would've trespassed long ago) |
![]() Mt. Haleakala at Dusk with Reflection from Science City Telescope |
![]() Small Waterfall Near East Corner of Property |
![]() Stream Near Southern Corner of Property |
![]() Path Near Stream |
![]() Stream |
![]() Plumeria in 2007 |
![]() Four Wheel Drive ATV |
![]() Approaching Lower Clearing from Adjacent Lot |
![]() My Kapu or No Trespassing Sign |
![]() Plumeria Cutting Blooming after 4 Months in Ground |
![]() First Plumeria Flowers on 4 Month Old Cutting |
![]() Ponds and Stream Above Property (Mid July) |
![]() Waterfall Along Road One Mile South from Property |
![]() Chicken at Entrance to Maluhia Country Ranches |
![]() Eric Feeding a Maluhia Chicken |
![]() Dusk from Road with Property Below |
![]() Laurie Anderson's Idea of Paradise |
![]() Some Jackass Laying Around Next Door |
![]() Ananda in the Lower Clearing |
![]() Ananda and Tom Near Driveway |
![]() Barbara and Ananda Looking at Whales |
![]() Upper Slope by Road Planted with Native Hawaiian Plants |
![]() Native Hawaiian 'Ohi'a Lehua in Bloom |
![]() Mt. Haleakala and Harbor to Southeast |
![]() Natural Stream on Southeast Edge of Property |
![]() Stairs to North Corner of Property |
![]() Orchids Blooming near Shed |
![]() Orchids Blooming near Shed |
![]() Orchids Blooming near Shed |
![]() Lights in Upcountry at Dusk |
![]() Largest of 30 Koa trees, One Year after Above Picture |
![]() Palm Planted on North Property Line |
![]() Early Grading Started in March, 2008 |
![]() More Grading in Late March, 2008 |
![]() Early Plumeria Blooms in April 2008 |
![]() Early Plumeria Blooms in April 2008 |
![]() Eric with Largest of 30 Koa Trees |
![]() Hawaiian Land Blessing / Groundbreaking April 3, 2008 |
![]() Rev. Adam Gomes with friends at Hawaiian Blessing |
![]() Rev. Adam Gomes with friends at Hawaiian Blessing |
![]() Eric, Barbara, and Rev. Adam Gomes at Blessing |
![]() More Grading in Early April, 2008 |
![]() More Grading in Early April, 2008 |
![]() More Grading in Early April, 2008 |
![]() Barbara with Jacaranda Tree |
![]() Barbara in Lower Clearing |
![]() Foundation Work Early May 2008 |
![]() Foundation Work Early May 2008 |
![]() Foundation Work Early May 2008 |
![]() Foundation Work Early May 2008 |
![]() Foundation Work May 10, 2008 |
![]() Foundation Work Late May, 2008 |
![]() 3D Builders Slowest in Maui |
![]() View from Lower Clearing Late May 2008 |
![]() Larger Lower Clearing Late May 2008 |
![]() Garage Retaining Wall Footing |
![]() Guest Bedroom Footing Late May 2008 |
![]() Dining Room Footings Late May 2008 |
![]() Path Down to Lower Clearing, May 2008 |
![]() Plumeria May 2008 |
![]() Plumeria May 2008 |
![]() Outrigger Canoe Made in 2007 Canoe Festival in Maui |
![]() Sunrise at the Property |
![]() Early Morning View to North along Road |
![]() Early Morning on Building Site, June, 2008 |
![]() Framing with a View June, 2008 |
![]() Framing with a View June, 2008 |
![]() Framing with a View June, 2008 |
![]() Garage Retaining Wall in Progress |
![]() Framing House in June, 2008 |
![]() View from Lower Clearing June, 2008 |
![]() Palm starting form a Coconut |
![]() Site of Future Costco Plastic Shed |
![]() Giant 50 Pound 8-inch Diameter Plumeria Cutting |
![]() House Decking Early July 2008 |
![]() House Decking a Few Days Later |
![]() Completed Costco Plastic Shed |
![]() Completed Garage Retaining Wall and Trench for Electricity |
![]() Lower Clearing with Shed |
![]() Orchids Blooming on Their Own |
![]() Post and Pier Framing of Master Bedroom |
![]() 4WD ATV in Costco Shed |
![]() Cruise Ship and Hawaii Superferry at Dusk |
![]() Delivery of 14 Tons of Blue Rock |
![]() First of Four Blue Rock Planters |
![]() First Blue Rock Planter |
![]() Graded for Second Costco Shed |
![]() Roof Truss Delivery in August, 2008 |
![]() Grading for First 20,000 Gal. Water Tank |
![]() Lower Clearing with Sheds and Planters |
![]() Lower Clearing with Sheds and Planters |
![]() Two of Four Blue Rock Planters |
![]() Sheds and Rental Car in Lower Clearing |
![]() New Riding Lawnmower in Lower Clearing |
![]() New Riding Lawnmower in Second Shed |
![]() House Construction Seen from Lower Clearing |
![]() Roof Trusses Almost All Installed in August, 2008 |
![]() Framing in Great Room Dining Area |
![]() Framing in Master Bedroom and Master Bathroom |
![]() Framing in Great Room in August, 2008 |
![]() Framing in Office and Guest Room |
![]() House Construction Seen from Boy Scout Camp |
![]() Blue Rock Culvert Under Construction |
![]() Great Room Framing August 31, 2008 |
![]() House Viewed From Street August 31, 2008 |
![]() 20,000 Gallon Agricultural Water Tank Installation |
![]() 20,000 Gallon Water Tank Viewed from Below |
![]() Roof Almost All Sheeted Garage and Entry Slabs Poured |
![]() Great Room Framing Looking into Office |
![]() Office Roof Framing September 1, 2008 |
![]() Office and Hallway Roof Framing |
![]() Guest Room Roof Framing |
![]() Main Lanai Framing September 1, 2008 |
![]() Pumping Concrete September 3, 2008 |
![]() Pumping Concrete September 3, 2008 |
![]() Pumping Concrete in Garage September 3, 2008 |
![]() Finished Concrete in Garage and Breezeway |
![]() Finished Concrete in Formal Entry |
![]() Breezeway Framing Started September 4, 2008 |
![]() House Construction Viewed From Entrance |
![]() House from Street Garage Framed |
![]() 20,000 Gallon Water Tank With New Shed |
![]() 20,000 Gallon Water Tank Backfilled |
![]() Water Tank with Superferry in Background |
![]() Moonrise Over Ocean from Propertry |
![]() Formal Entrance to House |
![]() House Construction Viewed from Entrance |
![]() House Construction Viewed from Below |
![]() Guest Room and Garage |
![]() Inside of Garage and Breezeway |
![]() Inside of Garage |
![]() Inside of Garage and Roof Joists |
![]() Office Framing September 24, 2008 |
![]() Guest and Office Bathroom Windows |
![]() Great Room Looking Toward Dining Room |
![]() Great Room Looking Toward Kitchen |
![]() Framing of 12 ft. x 10 ft. Master Closet |
![]() Master Bathroom Framing |
![]() Master Bathroom Sink and Two Closets |
![]() Master Bedroom, Lanai and Sitting Area |
![]() Master Bathroom Bathtub Area Framing |
![]() Water Tank and Shed for Pump |
![]() Water Pump Shed with Solar Panels |
![]() Main Lanai on View Side of House |
![]() Area Below House Grubbed for Terraced Walls |
![]() Trench for Top Terraced Wall Footing |
![]() Wind-Protected Area to Start Seedlings |
![]() Seedlings Plateau with Water Tank in Background |
![]() Topping Off Party Oct. 24, 2008 |
![]() Topping Off Party Oct. 24, 2008 |
![]() Topping Off Party Oct. 24, 2008 |
![]() Topping Off Party Oct. 24, 2008 |
![]() Topping Off Party Oct. 24, 2008 |
![]() Topping Off Party Oct. 24, 2008 |
![]() Rainbow During Topping Off Party |
![]() House with Board and Batton Siding Installed |
![]() Batons on Roof November 1, 2008 |
![]() Floor for Outdoor Shower in Lower Clearing |
![]() Plumeria and Sheds in Lower Clearing |
![]() Plumeria in Lower Clearing Gift from Tony |
![]() Water Tank, Retaining Walls, and Bird Feeder |
![]() Water Tank, Retaining Walls, and Hibiscus |
![]() Hibiscus Flower Near Water Tank |
![]() Great Room Kitchen Looking Toward Kitchen Nov. 4, 2008 |
![]() Sliding Glass Pocket Doors in Great Room |
![]() Front Entrance into Great Room |
![]() Fire Sprinklers and Electrical |
![]() Nitch Added Above Guest Room Closet |
![]() Riki Starting Top Terraced Blue Rock Wall |
![]() Blue Rocks On Top Terraced Wall |
![]() Stair Cut Out on Top Terraced Wall |
![]() Front Entrance with Facia Painted |
![]() Front Entrance with Facia Painted |
![]() Front Entrance and Ceiling |
![]() Sliding Glass Pocket Doors with Nitch Above |
![]() Some Kind of Wild Mushrooms |
![]() Top View of Wild Mushrooms |
![]() Water Tank and 160W Solar Panels |
![]() Charge Controller for Solar Panels |
![]() Tank with Retaining Wall and Solar Panels |
![]() Tank with Retaining Wall and Solar Panels |
![]() Water Tank with Drip Irrigation Controller |
![]() Battery Operated Drip Irrigation Controller |
![]() Fireplace Roughed in November 6, 2008 |
![]() Chimney Roughed in November 6, 2008 |
![]() Monier Tile Roof Installed January 9, 2009 |
![]() Fireplace in Great Room January 9, 2009 |
![]() Main Lanai January 9, 2009 |
![]() First Terraced Blue Rock Wall |
![]() First Terraced Blue Rock Wall and Lanai |
![]() First Terraced Blue Rock Wall Stairway Cut Out |
![]() House Viewed from Street Below |
![]() House Viewed from Lower Clearing |
![]() New Dodge Dakota 4x4 Pickup Truck |
![]() Neighbor's Horse in Morning |
![]() Brazilian Red Cap Cardinals and Male Northern Cardinal |
![]() Water Tank Filler Filter Nylon Sock |
![]() Driveway Grading around Road Storm Drain Culvert |
![]() Driveway Grading around Road Storm Drain Culvert |
![]() Driveway Grading around Road Storm Drain Culvert |
![]() Lots of Wires in Equipment Closet |
![]() Soffit in Office / Bedroom #2 |
![]() Air Returns Framed in Office / Bedroom #2 |
![]() 200 Amp Electrical Panels in Garage |
![]() Kitchen with Soffits and Island |
![]() Koa Tree Transplanted from Workshop Area |
![]() Area Grubbed for Workshop Area |
![]() Area Grubbed for Workshop Area |
![]() Hibiscus Plants Near Water Tank |
![]() Yellow Flower Near Property Line |
![]() Maui Fleet in Lower Clearing |
![]() Top Soil Delivery for Backfilling Rock Walls |
![]() Top Soil for Backfilling Blue Rock Walls |
![]() Cement Board on Main Lanai |
![]() Great Room with Insulation Installed |
![]() Floor Insulation Under House |
![]() Great Room with Sheet Rock Installed |
![]() Great Room with Sheet Rock Installed |
![]() First Two Blue Rock Terraced Walls |
![]() First Two Blue Rock Terraced Walls |
![]() First Baby Pineapple Starting to Grow |
![]() Hardwood Flooring Delivered & Acclimatizing in Great Room |
![]() Wood Installed on Soffits under Eaves |
![]() Great Room Quadruple Sliding Glass Door |
![]() Windows in Office (Second Bedroom) |
![]() Windows in Master Bedroom |
![]() Private Lanai off Guest Bedroom |
![]() Workshop and Lath House Grubbed and Staked |
![]() Moving Koa Tree to Make Room for Workshop |
![]() Trenching Agricultural Water Pipe from Tank |
![]() 20,000 Gallon Water Tank and Solar / Battery Operated Pump |
![]() Banana Plants in Lower Clearing |
![]() 1.5 inch Gravity Fed PVC Pipes from Water Tank |
![]() 1.5 inch PVC Pipes from Water Tank |
![]() 1.5 inch PVC Pipes from Water Tank to Sheds |
![]() 1.5 inch PVC Pipes to Hose Bib |
![]() First Baby Pineapple Starting to Bloom |
![]() Exterior of House Being Painted |
![]() Exterior Being Painted April 6, 2009 |
![]() Stephanie and Neighbor's Horse |
![]() Main Lanai and Terraced Walls From Below |
![]() Guest Room and Side of Garage |
![]() House Viewed from Lower Clearing |
![]() Pre Open House Party with Family |
![]() Installation of Cedar Ceiling in Great Room |
![]() Installation of Cedar Ceiling in Great Room |
![]() Installation of Cedar Ceiling in Great Room |
![]() Installation of Cedar Ceiling on Main Lanai |
![]() Forms on 200 ft. Long Driveway to Lower Clearing |
![]() First of Four Concrete Trucks And Pump |
![]() Pouring 200 ft. Long Driveway to Lower Clearing |
![]() Pouring 200 ft. Long Driveway to Lower Clearing |
![]() Finishing Offramp to Water Tank |
![]() Long Driveway Formed and No. 10 Mesh |
![]() Slowly Working Down Long Driveway |
![]() Slowly Working Down Long Driveway |
![]() Rough Broom Finish on Driveway |
![]() Starting to Pull Forms on Driveway |
![]() Completed Driveway to Lower Clearing |
![]() End of Driveway in Lower Clearing |
![]() House and Driveway from Maluhia Entrance |
![]() Guest Room Porcelain Tile Installation |
![]() Guest Room Porcelain Tile Installation |
![]() Guest Room Porcelain Tile Installation |
![]() Guest Lanai Porcelain Tile Installation |
![]() Guest Lanai Porcelain Tile Installation |
![]() Ricky Building Blue Rock Wall Below Water Tank |
![]() Banana Plants a Month Later |
![]() House from a Helicopter May 11, 2009 |
![]() House from a Helicopter Viewed Overhead |
![]() House from a Helicopter Viewed Overhead |
![]() Waterfall on the Way to Property at Mile Marker 8 |
![]() Stream on Lower Edge of Property |
![]() Stream on Lower Edge of Property |
![]() Waterfall near East Corner of Property |
![]() Widened Path to Stream |
![]() Master Bedroom Viewed from Below |
![]() Pineapple Growing in Lower Clearing |
![]() Wild Passion Flower (Liliko'i) Blooming |
![]() Acacia Hardwood Flooring Being Installed in Great Room |
![]() Cedar Reflective Ceiling in Great Room |
![]() Cedar Reflective Ceiling in Front Lanai Entrance |
![]() Cedar Reflective Ceiling in Main Lanai |
![]() Something Growing on Old Tree in Gulch |
![]() Something Growing on Old Tree in Gulch |
![]() Kawasaki Mule 4x4 with Dump Bed |
![]() Pattern of Erosion Caused by Rain from Roof |
![]() House Viewed from Maluhia Entrance |
![]() French Doors in Breezeway |
![]() Garage, Breezeway, and Front Entrance |
![]() Native Hawaiian 'Ohi'a Lehua in Bloom |
![]() Acacia Flooring Being Installed in Office |
![]() Load of EKO Systems Compost |
![]() Hydrogenias Blooming in Lower Clearing |
![]() Driveway Retaining Wall Footing |
![]() Driveway To Lower Clearing and Retaining Wall |
![]() World's Steepest Driveway at 24 Degrees (44.5 %) |
![]() World's Steepest Driveway at 24 Degrees |
![]() Terraced Walls Being Backfilled |
![]() First Two Terraced Walls Backfilled |
![]() Dining Room Pond Being Dug |
![]() Interior Finish Load Delivery |
![]() Ponds Dug Front being Graded |
![]() Master Bathroom Cabinets Installed |
![]() Great Room with Kitchen Cabinets being Installed |
![]() Kitchen Island Cabinets Installed |
![]() Kitchen Cabinets being Installed |
![]() Kitchen Cabinets being Installed |
![]() Kitchen Cabinets being Installed |
![]() Office Bathroom Cabinets being Installed |
![]() Footing for Third Terraced Wall |
![]() Driveway with Blue Rock Retaining Wall |
![]() Tank Offramp on Driveway to Lower Clearing |
![]() Third Terraced Wall Complete |
![]() Slate Veneer on Lanai Column |
![]() Slate Veneer on Front Columns |
![]() Louvered Doors Installed in Hallway |
![]() First Crop of Tomatoes |
![]() Front Doors Installed |
![]() Wainscoting Installed in Office |
![]() Trench for Six Inch Gutter Pipe to Catchment Water Tank |
![]() Six Inch Gutter Pipe with Valve and Overflow |
![]() Water Tank Automatic Float Valve |
![]() Plumbing for Automatic Float Valve |
![]() Automatic Float Valve Inside Water Tank |
![]() Pressurized Tank and Domestic Water Lines |
![]() Pressurized Tank and Domestic Water Lines |
![]() Wainscoting Installed in Breezeway |
![]() Stained Cedar Ceiling on Lanai |
![]() Copper Gutters Formed On Site |
![]() First Length of Copper Gutters Installed |
![]() Copper Gutters and Slate being Installed |
![]() Great Room Beam Wrapped in Hardwood |
![]() Great Room with Kitchen and Cedar Ceiling |
![]() Dining Room in Great Room |
![]() Solid Copper Gutters on Roof |
![]() Bamboo Being Installed on Master Bedroom Ceiling |
![]() Sunflower Blooming in Lower Clearing |
![]() Lots of Plumeria Blooming Lower Clearing |
![]() Sunlit Clouds at Sunset |
![]() Full Moon Over Haleakala |
![]() First Tiny Pineapple Ready to Pick |
![]() Ground Breaking on Barn/Workshop 6/24/09 |
![]() Recently Rooted Vanda Orchid Blooming |
![]() Jacaranda Tree in Lower Clearing |
![]() Rainforest Green Granite Installed in Office Shower |
![]() Glass Tiles Installed Around Future Mirror in Office Shower |
![]() Great Room Ceiling Fans Installed |
![]() Dining Room Behind Fireplace |
![]() Great Room Looking Toward Kitchen |
![]() Shower in Master Bathroom |
![]() Ceiling Fan in Master Bathroom |
![]() Sixth and Final Terraced Wall Complete |
![]() Bananas in Lower Clearing July 27, 2009 |
![]() First Bananas July 27, 2009 |
![]() Six Terraced Walls Viewed from Below |
![]() Front Walkways Being Formed |
![]() Guest Room Kitchen Backsplash |
![]() Guest Room Bathroom Sink |
![]() Guest Room Bathroom Shower |
![]() Kitchen in Great Room |
![]() Kitchen Island and Backsplash |
![]() Solid Monkeypod Desk in Office |
![]() Epoxy Coating on Garage Floor |
![]() Ricky Working on North End of Third Terraced Wall |
![]() Pebble Shower Pan in Office |
![]() Vanda Orchid Blooming |
![]() Bananas Continuing to Grow |
![]() Master Bathroom Under Construction |
![]() Master Bathroom Floor Tile |
![]() Twins Craig and Dean Working on Lanai Railing |
![]() Solid Monkeypod Desk in Office |
![]() Glass Vessel Sink in Office Bathroom |
![]() Glass Artist Tom Trottier and the Sandblasted Front Doors |
![]() Sandblasted Front Doors at Night |
![]() Front Doors from Outside |
![]() Sandblasted Main Hallway Door |
![]() Satellite Dishes Below Master Bedroom |
![]() Main Entry and Inlaid Humpback Whales |
![]() Great Room and Kitchen |
![]() Master Bath Tub and Shower |
![]() Great Room with TV and Fireplace |
![]() Main Lanai Viewed from Great Room |
![]() Great Room and Kitchen |
![]() Great Room with TV and Fireplace |
![]() Turtle Inlay in Breezeway |
![]() Master Bathroom Sinks and Avi Kiriaty Artwork |
![]() Guest Room LCD Flat Screen HD TV |
![]() Great Room LED Flat Screen HD TV and Speakers |
![]() Last of Driveway Poured |
![]() Terraced Walls Viewed from Below |
![]() Flower and Polka Dot Leaves Near Stream |
![]() Elephant's Ear Plant in Bloom |
![]() Fence Structure Around Second Water Tank |
![]() Stairs Off Guest Lanai |
![]() Blue Rock Wall in Front |
![]() House Viewed From Street October 23, 2009 |
![]() Painted Stainless Steel Metal Art on Front of House |
![]() Great Room Torn Up Again for Ceiling Repair |
![]() First Plantains Ready to Pick |
![]() Repainting Master Bedroom |
![]() Columns Under House Getting Textured |
![]() Retaining Wall Getting Textured |
![]() Blue Rock Walls in Front of House |
![]() Wood Storage for Wood Fired Pizza Oven |
![]() Blue Rock Walls and Fire Pit |
![]() Fire Pit in Front Under Construction |
![]() Blue Rock Stairs in Front Under Construction |
![]() Blue Rock Fire Pit Almost Done |
![]() Blue Rock Fire Pit Done |
![]() Front Blue Rock Walls Almost Done |
![]() Starting Screen Around Second Water Tank |
![]() Lath on Second Water Tank Screen |
![]() Second Water Tank Screen Painted |
![]() Master Bathroom Being Painted |
![]() Two Vehicles and a Mule Crammed into a Garage |
![]() Front Walkways Acid Stained and Sealed |
![]() Front Walkways Acid Stained and Sealed |
![]() Side Walkways Acid Stained and Sealed |
![]() Ricky's Long Wall from Driveway to Barn |
![]() House Viewed From Street January 5, 2010 |
![]() Tea Room by Edward Gordon on Fireplace in Dining Room |
![]() Workshop Slab Formed January 13, 2010 |
![]() Terraced Walls with Stairs Viewed from Below |
![]() Office Bathroom Painted January 13, 2010 |
![]() Master Bedroom Painted January 17, 2010 |
![]() Master Bathroom Painted January 17, 2010 |
![]() Master Bathroom Painted January 17, 2010 |
![]() Workshop Slab Poured January 19, 2010 |
![]() Barn Workshop Framing February 1, 2010 |
![]() Third Wall Going Up February 1, 2010 |
![]() Third Wall Up February 1, 2010 |
![]() Lath House Framing February 1, 2010 |
![]() Fourth Wall Up Floor Joists Started |
![]() Center Beam Up Floor Joists Started |
![]() Center Beam Up Floor Joists Started |
![]() Center Beam and Lally Column |
![]() Second Floor Sheeted and View |
![]() Rafters Up Back Side of Barn |
![]() Second Floor of Barn Hole is for Dormer |
![]() Landscaping in front of Guest Room |
![]() Landscaping along Driveway February 6, 2010 |
![]() Moonrise over Haleakala February 7, 2010 |
![]() Dormer Up and Roof Sheeted February 8, 2010 |
![]() Barn Dormer from Inside February 8, 2010 |
![]() Barn Dormer from Upstairs February 8, 2010 |
![]() Plumeria Seed Pods on Dormant Plumeria |
![]() LED Solar Landscaping Lights at Dusk |
![]() Barn Roof Sheeted Ridge Beam Not Trimmed Yet |
![]() Windows and Siding Being Installed |
![]() Greenhouse / Lath House Framed |
![]() Barn Stairs Installed |
![]() Barn Upstairs and Dormer |
![]() Barn Upstairs and Stairwell |
![]() Barn with Siding Installed and Scaffolding Still Up |
![]() Barn Dormer on Second Floor and Balcony |
![]() Barn Loft Door and Window |
![]() Barn Loft Door and Window |
![]() Barn Loft Upstairs with French Doors Installed |
![]() GreenHouse / Lath House Viewed from Barn |
![]() 24-inch Deep Trench Dug to Barn for Electrical Power |
![]() Cupola Installed on Barn Roof |
![]() First Workbench with Compound Miter Saw |
![]() Concrete Poured Behind Workshop |
![]() Concrete Poured Around Workshop |
![]() House Staking (1 of 2) |
![]() House Staking (2 of 2) |
![]() Stairs in Progress |
![]() Sunrise |
![]() Lower Clearing (June, 2007) |
![]() Second Trail |
![]() Lower Clearing w/ Trails |
![]() Second Trail / Lower Clearing |
![]() Second Trail from Stream |
![]() Third Trail from House Pad |
![]() Third Trail from Lower Clearing |
![]() Pools Above Property |
![]() Third Trail from House Pad Down to Second Trail |
![]() Lower Clearing with Plumeria Cuttings (Oct. 2007) |
![]() Lower Clearing after Trees Removed (Oct. 2007) |
![]() Smaller Forest above Lower Clearing (Oct. 2007) |
![]() View from Driveway |
![]() Stream Along Back of Property |
![]() Lower Clearing in Jan. 2008 |
![]() Corner of Lower Clearing |
![]() Path to Driveway (Jan. 2008) |
![]() Maluhia Chicken |
![]() Dusk |
![]() Path to Driveway (Mar. 2008) |
![]() Path Down from Driveway |
![]() Plumeria Clearing |
![]() Sensitive Plant |
![]() ATV Ride 1 |
![]() ATV Ride 2 |
![]() Gate Layout |
![]() Grading Progress (Apr. 2008) |
![]() Grading Progress 2 (Apr. 2008) |
![]() Workshop Location & Koa |
![]() Foundation Late May, 2008 |
![]() Walking Around Foundation |
![]() Foundation from Top of Piers |
![]() Lower Clearing, May 2008 |
![]() Lower Clearing, May 2008 |
![]() Driveway from Lower Clearing |
![]() Plumeria Field, May 2008 |
![]() Up New Stairs, May 2008 |
![]() Down New Stairs, May 2008 |
![]() Location of First Water Tank |
![]() Canoe On Property |
![]() Second Trail to Dropoff |
![]() Workshop Location & Koa |
![]() New Shed Location |
![]() North Corner & Shed Location |
![]() Lower Clearing June 2008 |
![]() Lower Clearing June 2008 |
![]() Garage Retaining Wall |
![]() Building Site in June 2008 |
![]() Building Site in June 2008 |
![]() Building Site in July 2008 |
![]() End of Trail to Dropoff |
![]() First Trail to Second Clearing |
![]() Framing Status July 2008 |
![]() Electrical Trench July 2008 |
![]() ATV Ride 3 |
![]() Video of Work in Lower Clearing |
![]() Grading for Second Shed |
![]() Video of Grading for Water Tank |
![]() View Side of House |
![]() Framing Status August 2008 |
![]() Roof Framing Up |
![]() Posts Under House |
![]() Sept. 1 House Walk Through |
![]() House From Street |
![]() Pouring Garage Slab |
![]() Pouring Garage Slab |
![]() Water Tank Installation |
![]() House From Street |
![]() Sept. 19 House Walk Through |
![]() Septic and Lower Lot Work |
![]() Septic Tank and Leech Field |
![]() House From Street |
![]() Water Tank and Pump Shed |
![]() Grubbing for Blue Rock Walls |
![]() Sept. 24 House Walk Through |
![]() Water Tank Retaining Wall |
![]() Water Tank and Pump |
![]() Water Tank and Water Line |
![]() House Walk Through |
![]() House From Street |
![]() Time Lapse Video |
![]() House Walk Through |
![]() Water Tank and Plumbing |
![]() Area Grubbed for Workshop |
![]() Area Above House |
![]() Grading Around Driveway |
![]() Grading Around Driveway |
![]() ATV Ride 4 |
![]() Workshop Staking |
![]() Workshop Staking from Front |
![]() Workshop Staking from Above |
![]() Workshop Staking from Back |
![]() Second Trail and Plants |
![]() House with Drywall Up |
![]() Pipes from Water Tank |
![]() Wide Angle Walkthrough |
![]() Second Blue Rock Wall |
![]() Second Wall Wide Angle |
![]() Looking Around from Driveway |
![]() Outside Painted Inside Primered |
![]() Pouring Lower Driveway |
![]() Pouring Lower Driveway |
![]() Pouring Lower Driveway |
![]() Pouring Lower Driveway |
![]() Long Lower Driveway |
![]() Plants in Gulch |
![]() Hose Bibs Near Sheds |
![]() Path to Stream Widened |
![]() Stream on Back Property Line |
![]() Waterfall at Corner of Property |
![]() Stream a Few Days Later |
![]() Layout of Ponds in Front |
![]() Footing for Retaining Wall |
![]() Blue Rock Walls Backfilled |
![]() House From Street |
![]() Third Blue Rock Wall |
![]() Water Tank Automatic Filler |
![]() Water Tank Automatic Filler |
![]() View from Nearby Highway |
![]() Copper Gutter Installation |
![]() Copper Gutter Installation |
![]() House Walkthrough 6/15/09 |
![]() House Walkthrough 7/3/09 |
![]() Stairs Curving Around Tank |
![]() House Walkthrough 7/12/09 |
![]() Workshop Ground Breaking |
![]() House Walkthrough 7/25/09 |
![]() Six Terraced Walls From Below |
![]() House Walkthrough 8/9/09 |
![]() House Walkthrough 8/19/09 |
![]() Troweling Workshop Slab |
![]() Barn Walkthrough 2/10/10 |
![]() |
|
Location of Property on Maui |
|---|
![]() |
|
Sunrise Direction |
|---|
Sun Angle January - June |
Sun Angle July - December |
|
Sun Angles Click either thumbnail for full size chart |
|
|---|---|
![]() |
|
Property Boundaries |
|---|
![]() |
|
Lot Map |
|---|
![]() |
|
House Design Front Elevation Green Paint Metal Roof Monier Sea Green Saxony Shake Tile Roof Selected |
|---|
![]() |
|
House Floor Plan |
|---|
![]() |
|
Current House Floor Plan Larger Image Current House Floor Plan PDF |
|---|
![]() |
|
House Site Plan House Site Plan PDF |
|---|
![]() |
|
Farm Plan
Updated Agriculture Plan |
|---|
![]() |
|
New Topographic Map. Each line is two feet. Larger Image with Scales New Topographic Map PDF |
|---|
![]() |
| Monthly Average Temperatures |
|---|
![]() |
| Maui Wind Patterns |
|---|
![]() |
| Maui Rain Map |
|---|
| Average Rainfall (inches): | |
|---|---|
| January | 6.2 |
| February | 4.4 |
| March | 4.8 |
| April | 4.4 |
| May | 2.1 |
| June | 0.9 |
| July | 1.5 |
| August | 1.7 |
| September | 1.4 |
| October | 3.0 |
| November | 4.4 |
| December | 5.2 |
| Yearly Total | 40.0 |